Production of Vande Bharat Express comes to a grinding halt

Recently,the production of India’s first semi high-speed train called as Vande Bharat Express(Train 18) has been stopped at the Integral Coach Factory(ICF) in Chennai. The reason is that the design of the Train has been found to be violative of certain specifications. The primary issue was that making of Train had dozens of deviations from… Continue reading Production of Vande Bharat Express comes to a grinding halt

India’s fastest Vande Bharat Express to be flagged off by PM Narendra Modi tomorrow

India’s first semi-high speed train Vande Bharat Express (Train 18) will be flagged off by Prime Minister. Train 18 is India’s first indigenously built engineless train capable of running at a speed of up to 160 kmph,It is also being referred to as a successor to the 30-year-old Shatabdi Express. The fully air-conditioned semi-high speed… Continue reading India’s fastest Vande Bharat Express to be flagged off by PM Narendra Modi tomorrow